The following resources are for land development projects in the City of Centennial.  Projects in unincorporated Arapahoe County use different documents, which are available here.  You can confirm your project jurisdiction on ArapaMap.

SEMSWA Manuals for the City of Centennial 

SEMSWA has adopted and revised the Grading, Erosion, and Sediment Control (GESC) Manual and the Stormwater Management Manual for work in the City of Centennial.

  • SEMSWA Stormwater Management Manual – The Stormwater Management Manual provides requirements for the planning, design, construction, and operation of stormwater facilities within the City of Centennial.
    • Update/Amendment History: Complete SMM updated January 2017, Chapter 14 (Stormwater Quality) updated July 2019.  20/10 calculator updated October 2020.
  • SEMSWA Grading, Erosion, and Sediment Control (GESC) Manual – The Grading, Erosion, and Sediment Control (GESC) Manual, as amended, was adopted by the SEMSWA Board of Directors (Resolution 23-02) in January of 2023, effective February 17, 2023 for use within the City of Centennial portion of the SEMSWA Service Area. The current version replaces the June 2019 version.
Document Templates for Development Projects in the City of Centennial 

The following documents may be required for some land development projects in the City of Centennial; please refer to your presubmittal notes or contact a SEMSWA Land Development Engineer to determine if any of these are required for your project.

SEMSWA Drainage Report Checklists 

The drainage checklists were formulated for use in the City of Centennial from Chapter 4 of the SEMSWA Stormwater Management Manual.

CHECKLIST FOR PHASE I DRAINAGE REPORT AND PLAN.pdfCHECKLIST FOR PHASE II DRAINAGE REPORT AND PLAN.pdfCHECKLIST_FOR_PHASE_III_DRAINAGE_REPORT_AND_PLAN_FINAL_062019_09.10.24.pdf
City of Centennial Construction/Design Checklists 

The Construction Design Checklists were formulated for use in the City of Centennial to ensure a complete set of Construction Drawings.

SEMSWA Permanent Water Quality Control Measure (CM) Standard Details 

The Permanent CM Standard Details below were adopted to be used in the City of Centennial and shall be used to comply with the criteria in the\ SEMSWA Stormwater Management Manual.  CAD .dwg files are available upon request.

SEMSWA Operations and Maintenance Checklist & Maintenance Agreement for Permanent Water Quality Control Measure Facilities 

The Design Engineer for land development projects in the City of Centennial will prepare an Operations and Maintenance (O&M) Site Plan to accompany the Operation and Maintenance Agreement for all post construction water quality facilities using the SEMSWA provided checklist.   

All O&M documents will be recorded with Arapahoe County Clerk and Recorder.

SEMSWA SOPs for Water Quality Post-Construction Control Measure Inspection & Maintenance 

Standard Operating Procedure documents have been prepared for each SEMSWA Standard Water Quality Post Construction Control Measure to assist with inspection and maintenance protocols.