Master Planning
The Mile High Flood District (MHFD) Produces Several Types Of Master Plans.
The most common types include:
- Major Drainageway Plans (MDP)
- Outfall System Plans (OSP)
- Flood Hazard Area Delineation Studies (FHAD)
- Stabilization Plans
- Hydrology Reports
Each plan type produces different kinds of information. Results from these studies are used to plan for the future and include projects that need to be done for safety, to protect against flooding, to keep channels stable, etc. Cost estimates for CIP programs are also determined through these studies. Results from these plans establish the projects included in SEMSWA’s CIP program.
Full List of Mile High Flood District (MHFD) Master Planning Projects
Completed Master Planning Projects in SEMSWA’s Service Area
CHERRY CREEK MAJOR DRAINAGEWAY PLAN
- Completed November 2022 – Click to visit drainage way plan website